Planned Maintenance – VPC Portal

Closed


By Dan Miller on 25th June, 2018.

We are migrating load-balancing for the VPC user portal. The portal will be briefly unavailable for approximately 5 minutes while this occurs.

Site: All VPC Customers
Date: Monday 25th June 2018
Time: Between 1800 and 1830 BST
Works: VPC Portal Load-balancer Relocation

What are we doing?

We are moving the load-balancing platform for the VPC Portal to new hardware. This improves the resilience of our portal, creating additional multi-site redundancy options.

What does this mean to you?

The VPC Portal at vpc.securacloud.com will be unavailable for a period of approximately 5 minutes during the maintenance window as the back-end virtual machines are migrated. Customer virtual machines will remain accessible. Customers will be unable to change firewall rules, virtual machine configuration or Power off/Power on virtual machines during this brief window.


One response to “Planned Maintenance – VPC Portal”

  1. Dan Miller says:

    All works have been completed and the VPC Portal is available.